top of page

SOME OF OUR PROJECTS

Check all details of our most inspiring project: Cal Guerxo at https://vimeo.com/514324352/8f0415f4dc

cal guerxo.jpg

CAL GUERXO

PROJECT

Location: Bresca (Spain)

Type: Residential

End of Works:  Abril 2019

FEATURED INFORMATION

Secreted away in the Spanish Pyrenees Cal Guerxo is net positive for carbon, water, and energy.

In 2015, Emmanuel Pauwels, together with his team at Green Living Projects, started the renovation of a medieval home. Today, 5 years later, this project is in the process of getting Living Building Challenge Certification demonstrated that the future can be positive.

OUR CONTRIBUTION

Biophilia design

Living Materials Consultancy

Regenerative evolution process

Certification process management
Integrative design process facilitation

can cauliques.jpg

CAN CAULIQUES 

PROJECT

Location: Sant Ferriol  (Spain)

Type: Residential

End of Works: April 2020

FEATURED INFORMATION

Renovation of the entire interior to adapt it to the functional, aesthetic and comfort requirements, with a traditional and bioclimatic design, keeping the existing structure to the maximum.

OUR CONTRIBUTION

Finding the balance between rehabilitation techniques of a historic building and the limiting requirements of the certification process.

Projects: Projetos
campus.jpg

GENERALITAT DE CATALUNYA (ADMINISTRATIVE DISTRICT)

PROJECT

Localization: Barcelona (Spain)

Type: Public Offices

End of works: October 2018

FEATURED INFORMATION
Energy Efficiency: 63 kwh / m² / year
Water Efficiency: 14 liter / person / year
Waste: Diverted construction waste from landfill + 90%.

Indoor Air Quality: Active measurement of outdoor and indoor air quality parameters​

OUR CONTRIBUTION

Accompany the project team in reducing energy and water resources
Introduce biophilic shapes into the design
Provide healthy spaces for future occupants

Certification process management

Cw-E2foXgAAVn7H.jpg

ACTIU 

PROJECT

Localization: Alicante (Spain)

Type: Offices

End of Works: Existing Project​

OUR CONTRIBUTION

Help on basic parameters monitoring to assess resources consumption, waste generation and occupants wellbeing

Certification process management

Projects: Projetos
yiRDKvR_edited.jpg

AGEMAR

PROJECT

Localization: Atenas (Greece)

Type: Headquarters

End of works:  2018

OUR CONTRIBUTION

Engaging a multidiscuplinary team in early analysis to reduce environmental impacts of the project

Certification process management

mg967374.jpg

BARO VIVERS CIVIC CENTRE

PROJECT

Localization: Barcelona (Spain)

Type: Civic Centre 

End of Works: February 2015

FEATURED INFORMATION:

Public use project which includes a green roof and a green façade maintained through a rainwater tank. 

OUR CONTRIBUTION

Ensure strategies to reduce project impact within budget limitations

Certification process management

Projects: Projetos
Captura-de-pantalla-2019-01-31-19.39.54.

HAPPYPUNT

PROJECT

Localization: Mataró (Barcelona)

Type: Logistic Centre, Offices and Showroom

End of Works: February 2019 

OUR CONTRIBUTION

Build client awareness of the consumption of building resources and the potential for improvement.

Help on basic parameters monitoring to assess resources consumption, waste generation and occupants wellbeing.

Projects: Projetos

We belive that often less is more.

If you want a full list of our projects you can find it here: http://www.gbig.org/org_profiles/2081

Projects: Projetos
Forest
bottom of page